603 Technology Solutions

Saint Joseph Residence Technology Modernization

From legacy infrastructure to a modern technology platform.

A phased modernization journey designed to improve resilience, visibility, operational continuity, and future readiness — without throwing away investments that still deliver value.

Client success story

Senior care technology

Phase 1 complete

Resilience

Visibility

Asset optimization

Future readiness

Preserve what still delivers value. Replace what creates risk. Build a foundation that can grow.

Project type

Multi-phase modernization

Current status

Phase 1 completed

Next milestone

Cloud communications

Download the full story

Review the complete project case study.

Get the detailed PDF covering the challenge, architecture, resilience strategy, and modernization roadmap.

Download PDF →

The project

Modernize strategically. Not disruptively.

Saint Joseph Residence partnered with 603 Technology Solutions to create a practical roadmap for aging and separately managed technology systems. Instead of replacing every component at once, the initiative combines targeted upgrades, cross-vendor coordination, and the continued use of assets that still provide operational value.

The result is a more resilient and manageable foundation for communications, cloud services, identity, and security — built around the needs of a senior care environment where dependable systems support staff productivity and continuity of resident services.

The roadmap

A foundation for what comes next.

Last updated: September 2026

01Completed

Foundation

Planning began in February 2025

Saint Joseph Residence began working with 603 Technology Solutions to set technology goals alongside long-term budgeting and capital improvement planning.

02Completed

Phase 1

Connectivity & infrastructure modernization

MDF and IDF redesign, five Layer 3 PoE switches, Internet modernization, power protection, wireless optimization, and unified management.

03Completed

Connectivity milestone

Fidium Fiber primary ISP migration

Migrated to Fidium Fiber as the facility’s primary ISP, providing symmetrical 1 Gig service to the facility.

04Planned

Phase 2

Cloud communications transformation

Planned NUSO cloud voice and Yealink phones will replace the legacy Toshiba PBX and reduce dependence on aging telephone equipment.

05Planned

Phase 3

Secure cloud workplace migration

A planned transition to Microsoft 365, Entra ID, Defender, enhanced email protection, encrypted email, and DNS security.

Project gallery

See the starting conditions and the completed Phase 1 MDF and IDF work. The gallery follows the project from before to after.

Administrative Building Basement before IDF installation as part of Phase 1

Before Phase 1

Administrative Building Basement before IDF installed as part of Phase 1.

1 / 6

Business outcomes

Technology work that makes the business stronger.

01

Increased reliability

Redundant switching, layered power protection, and connectivity failover reduce dependence on individual components.

02

Unified visibility

Centralized wired and wireless management provides one place to monitor, troubleshoot, and support the environment.

03

Better asset value

Existing fiber, wireless access points, failover service, and generator capacity remain productive parts of the solution.

04

Future readiness

The upgraded foundation supports cloud phones, Microsoft 365, advanced security, and future backbone improvements.

Before & roadmap

A clear path from fragmented to manageable.

The goal was not to replace technology for the sake of replacement. It was to reduce risk, improve control, and make every useful investment work harder.

Area
Phase 1 / roadmap
Switching
Two legacy HP switches → Five Ubiquiti Layer 3 PoE switches
Internet
Multiple cable feeds → Symmetrical 1 Gbps Fidium Fiber + T-Mobile failover
Topology
Limited redundancy → Resilient MDF and IDF distribution
Power
Generator only → Monitored UPS, RPS, intelligent PDU + generator
Visibility
Fragmented administration → Single pane of glass
Voice
Legacy Toshiba PBX → Planned NUSO cloud voice + Yealink phones

Technical highlights

Enterprise-grade infrastructure, thoughtfully deployed.

Gateway & management

Ubiquiti UDM-PRO and integrated UniFi management

Switching

Five USW-PRO-HD-24-PoE Layer 3 switches — three in the MDF and two in the IDF

Power resilience

RPS units, PDU-PRO, monitored CyberPower UPS systems, and the facility generator

Internet resilience

Symmetrical Fidium Fiber with existing T-Mobile failover

Wireless

Eleven retained U6-PRO access points, one U7-PRO-XG, and three U6-Mesh access points

Backbone

Existing six-strand OM2 fiber retained for the current inter-building design

Your next step

Building your own modernization roadmap?

Schedule a consultation with 603 Technology Solutions. We’ll help you identify what to preserve, what to modernize, and how to move forward without unnecessary disruption.